Comissionamento rápido

Coloque o MSA-810 em serviço passo a passo, selecione extensões, atribua endereços e valide o funcionamento.

elausys · 06 setembro 2026
Nesta página

1 Check the system configuration

Select the master and required extension modules. Check the eight-extension limit, 72-output system limit and maximum of 40 switching channels rated 10 A. Large extensions use more than one ETS extension position. See System overview and limits and ETS configuration.

See System overview and limits

2 Mount and connect with power off

Follow Installation and manual operation and the wiring diagram for each module. Mount extensions to the right of the master on the same DIN-rail row and join their side connectors. Connect the KNX bus and external 30 VDC supply. Observe all electrical precautions before energising.

See Installation and manual operation

3 Address the physical extensions

After auxiliary power-up, hold A on the master for more than one second. Press A on each extension from left to right; its LEDs blink to confirm registration. Briefly press A on the master to finish. See Addressing.

See Installation and manual operation

4 Configure the master in ETS

Select the installed extensions in physical order, then any virtual logic modules. Set channel use, operating functions, startup behaviour and safety reactions. The full configuration is downloaded to the master; extensions require no separate ETS programming.

See ETS configuration and general settings

5 Assign addresses and download

Assign the physical address and group addresses in ETS. Use P for KNX programming mode. Match each group address to the object datatype in the relevant function reference and download the application.

See ETS configuration and general settings

6 Check operation

Test each configured channel and its status feedback. For shutters and blinds, measure travel and slat times and enter them in ETS. Before configuration, never activate both motor direction channels together. See Shutter and blind functions and Logic functions and validation.

See Logic functions and validation

Manual navigation

All manual articles

Perguntas frequentes

As extensões precisam de uma descarga ETS separada?

Não. A configuração completa do sistema é descarregada para o atuador master.

O que deve ser verificado após o comissionamento?

Teste cada canal configurado e o respetivo estado. Verifique o arranque, bloqueio e reações de segurança e meça os tempos de deslocação e das lâminas.