Follow these steps in order. Use the detailed sections for model-specific settings and the complete object reference.

1 Preparar la instalación

Have the gateway, KNX bus connection, 12-30 VDC auxiliary supply, network connection, ETS application and inverter configuration access ready. Check compatibility and firmware in Sections 3 and 10.

2 Conectar y alimentar la pasarela

Connect KNX at the top. Connect auxiliary power and RJ45 Ethernet at the bottom. Connect the equipment to the same local network. The green Network LED confirms the Ethernet link; see Section 3.

3 Configurar la conexión del inversor

Enable Modbus TCP or configure the required inverter connection using Section 4. Confirm the inverter address, port and Unit ID.

4 Configurar la red y el enlace Modbus

Open 192.168.1.51 from a laptop on a compatible network and assign an appropriate fixed gateway IP address. Set Mode to Connect, Server IP to the inverter address, Server Port to 502 and Unit ID to 1.

5 Configurar el dispositivo KNX en ETS

Assign a free physical address. Set Inverter model to 3 for Fronius including Gen24; 6 for Fronius Symo Hybrid. Set the AC network, applicable PV circuits, refresh rate and available equipment. Set Device Options to the Fronius Smart Meter Modbus ID when a meter is installed; check the actual ID (default 200 or 240). See Sections 5 and 6.

6 Enlazar direcciones de grupo y descargar

Assign group addresses to the required objects. Press P when ETS requires programming mode and perform a full application download for initial commissioning. See Section 5.

7 Validar datos y activar la lógica

Check the Connected LED and Module status (GO 1 = 0). Read firmware (GO 2), wait for the polling interval and compare live values with the inverter. Check power directions and optional equipment before enabling logic. See Section 7.

Commissioning is complete when

The network and inverter links are established, the ETS download succeeds, and the required group objects return plausible values for the installed equipment.

All chapters of the INV-KNX Fronius user manual

Preguntas frecuentes

¿Qué debe estar preparado antes de la puesta en servicio?

Prepare la pasarela, una alimentación auxiliar de 12–30 VDC, el bus KNX, las conexiones de red, la aplicación ETS adecuada y acceso a la configuración del inversor.

¿El LED Network demuestra que la puesta en servicio ha terminado?

No. El LED Network confirma el enlace Ethernet físico. Compruebe Connected, complete la descarga ETS y compare los valores KNX con el inversor.

¿Cuándo debo activar la automatización basada en datos del inversor?

Compruebe el estado del módulo, el intervalo de consulta, las mediciones, las direcciones de potencia y la disponibilidad de equipos opcionales.

Seguir explorando

Encuentre las demás guías de este producto en la documentación.

Volver a Manual de usuario INV-KNX Fronius