Every KNX integrator knows the challenge: managing multiple device types, juggling separate configurations, and dealing with overcrowded distribution panels. We believe your expertise should focus on delivering exceptional automation solutions.
That's why we engineered a system that eliminates unnecessary complexity while maximizing your capabilities in the field.
True modularity through intelligent design.
Instead of forcing you to choose between specialized devices or compromise on functionality, we created a unified platform where one master controls everything. Start with what you need today. Expand seamlessly tomorrow.
Mix switching, dimming, DALI, heating, and logic functions—all managed through a single KNX interface. Combined with ElauPro cloud integration, your ETS configuration is generated automatically, dramatically reducing commissioning time and eliminating configuration errors.
Build Your System, Your Way
Start with the MSA-810 master actuator featuring 8 switching channels at 10A, then expand with up to 8 extension modules to reach 72 channels—all controlled through a single KNX device address. Mix switching, dimming, heating, DALI, and analog outputs in any combination that matches your project requirements.
Commercial Advantage
Quote with confidence knowing you can scale the system as project scope evolves, without replacing core hardware.

Every Function. One Platform.
Why manage separate devices for switching, blinds, heating, and lighting when one system handles it all?
Commercial Advantage
Reduce inventory complexity and supplier management. One product family covers virtually every actuator requirement.

Beyond Simple ON/OFF
Every switching channel offers far more than basic relay control. Configure each channel independently for:
Technical Highlight
Flexible channel pairing allows any two adjacent channels to operate as independent switches or combined shutter/blind control.
Commercial Advantage
Deliver sophisticated functionality without external timers or logic modules, reducing project costs while increasing client satisfaction.

Complete Motor Control Intelligence
Motorized blinds, shutters, and awnings demand precise control. The Universal Actuator System delivers professional-grade shutter management:
Technical Highlight
4-bit dimming object support enables seamless integration with standard KNX pushbutton interfaces.
Commercial Advantage
Eliminate dedicated shutter actuators in mixed installations—use the same master for lights and blinds, simplifying your bill of materials.

Professional Climate Management Built-In
Integrate valve control directly into your actuator system with five control modes designed for HVAC requirements:
Technical Highlight
Advanced temperature management includes Comfort, Standby, and Night setpoint modes with independent offsets, heating/cooling mode switching, frost protection, and valve protection.
Commercial Advantage
Deliver complete room climate control without dedicated heating actuators, reducing device count and simplifying system architecture.

Professional DALI Control Through KNX
The DBE-64 extension module is a full-featured DALI bus master that bridges KNX automation with professional DALI lighting infrastructure. Control up to 64 individual DALI devices or organize them into 16 groups.
Commercial Advantage
Integrate DALI lighting directly into your actuator system with professional commissioning tools included.

64 Logic Functions. Zero External Hardware.
Reduce system complexity by embedding automation logic directly in the actuator. Configure up to 64 logic functions across 8 virtual modules:
Commercial Advantage
Deliver sophisticated automation scenarios without external logic modules or home servers—reducing costs, failure points, and commissioning complexity.

Automatic Configuration. Instant Deployment.
The Universal KNX Actuator System is fully integrated with the ElauPro cloud platform, transforming how you configure and deploy KNX projects:
Commercial Advantage
Dramatically reduce ETS programming time. Focus on solution design and client relationships instead of manual parameter configuration.

Build the exact system your project demands. Each extension connects to the MSA-810 master, automatically recognized and configured through ElauPro.
Note: Maximum 40 switching channels at 10A combined per master. Use 16A extensions for additional capacity.
Discover our range of professional solutions for your automation projects.

KNX master switching actuator with 8 channels at 10A forming the foundation of the Universal KNX Actuator System. Expandable to 72 channels via up to 8 extension modules controlled through a single KNX address. Features built-in logic functions, manual pushbuttons, and ElauPro cloud integration for rapid ETS configuration.

High-current 8-channel switching extension for the Elausys Universal KNX Actuator System, delivering 16A per channel for heavy-duty loads. Extends MSA-810 master with independent relay outputs for high-power lighting, appliances, and industrial equipment. Channels operate independently or grouped for shutter control operation;

Extension module for the Elausys Universal KNX Actuator System adding 8 switching channels at 10A each to the MSA-810 master actuator. Each channel supports independent switch or shutter/blind configuration through a single KNX interface, enabling scalable building automation up to 72 outputs.

High-capacity 24-channel switching extension module for the Elausys Universal KNX Actuator System. Expands MSA-810 master actuator with 24 relay outputs at 10A/230VAC each, configurable as independent switching channels or shutter/blind pairs. Ideal for large-scale commercial lighting and motor control applications requiring maximum channel density.

8-channel LED dimming extension for the Elausys Universal KNX Actuator System providing PWM control of 12-24VDC LED strips and fixtures at 2A per channel. Configurable as individual dimmers or grouped for RGB/RGBW and Tunable White applications with smooth dimming curves. Requires MSA-810 master actuator.

8-channel KNX heating valve actuator extension for the Universal Actuator System controlling electrothermic valves in HVAC applications. Supports ON/OFF switching PWM modulation and PI temperature control for underfloor heating radiators and fan coil units. Requires MSA-810 master actuator.

8-channel KNX digital output extension for the Universal Actuator System providing 0.25A switching at 12-30VDC for low-voltage control of valves, indicator LEDs, external relays, and contactors. Configurable as switch actuator, shutter controller, or heating valve control. Requires MSA-810 master actuator.

Professional KNX-to-DALI gateway extension for the Universal Actuator System, controlling up to 64 individual DALI devices or 16 groups through a single KNX interface. Features built-in web commissioning interface for visual addressing, direct gear testing, real-time lamp monitoring, and failure detection. Requires MSA-810 master actuator.